75 Bed Ward Block, UCH Galway

  1. Home
  2. Projects
  3. 75 Bed Ward Block, UCH Galway

Construction of a 75 bed ward block facility at the University Hospital Galway, four storeys high building, plant room and associated works and services. GFA 6,252m².

Compliant under current Building Control Amendment Regulations 2014. BIM was utilised on this project. Works carried out on a tight urban site of a functioning live acute healthcare campus.

Sub-Contractor – Mechanical Building Services Installation

  • Pipework installation
  • Ductwork installation
  • Heating Services
  • Soils & Waste Services
  • LTHW & Domestic Water Services
  • Space Cooling
  • Gas Services
  • Ventilation and Air Conditioning Services
  • Refrigeration Services
  • Fire Safety Services
  • Pumping Equipment installation
  • Thermal Insulation Services
  • Medical Gases services
  • Security and Protection
  • Oxygen & Vacuum Services
  • Specialist Systems
  • Testing & Commissioning
  • Completion of as build drawings and operating and maintenance manuals
Project Details
Value €3.1m
Handover Date October 2016